High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing

Product Details
Customization: Available
After-sales Service: Remote Video After-Sales Service
Warranty: 1 Year
Gold Member Since 2013

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Experienced Team
The supplier has 5 foreign trading staff(s) and 2 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (15)
  • High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
  • High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
  • High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
  • High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
  • High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
  • High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Company Profile
  • After Sales Service
  • FAQ
Overview

Basic Info.

Type
Electrostatic Spraying Equipment
Coating
Powder
Substrate
Steel
Certification
CE, ISO
Condition
New
Usage
Mertial Surface Treatment
Key Words
Powder Coating Production Line
Method Type
Fully Automatic
Technology
Electrostatic Technology
Powder Recovery Rate
98%
Brand
Jrx
Shipping Package
Plastic
After Sale
Supported
Transport Package
Plastic
Specification
customized
Trademark
JRX
Origin
Shandong

Product Description

High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing

Product Description
The design of the automatic spraying line reduces a lot of labor. It mixes the powder with air in the powder feeder and sends it to the powder spray gun.
 
The high voltage generated by the high-voltage electrostatic generator is connected to the inside or front end of the powder spray gun.
 
The inside or outlet of the powder spray gun is charged, and under the combined action of air force and electrostatic force, the powder particles are sprayed on the workpiece to be coated in a directional direction.
 
Safety and environmental protection, high output, high efficiency, uniform coating.
 
High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
 

Pretreatment equipment

Pretreatment equipment is widely used in the household appliance spraying industry (air conditioner, refrigerator, washing machine, etc.), mainly to effectively clean the oil stain generated during the processing of the product shell, form a protective film on the product surface, and improve the adhesion of the workpiece after powder spraying in the subsequent process. Ensure that the powder coating of the product is not easy to fall off and rust.

Moisture drying furnace

1. the main body of the drying rack is made of square tubes, and the chamber body is a plug-in plate combined bridge insulation structure, which is convenient for transportation and installation.
2. during installation, 100mm thick rock wool shall be pasted at the joint of furnace plate for insulation to ensure that there is no leakage at the wall joint. The average surface temperature of the outer wall of the drying channel shall not be higher than the ambient temperature by 15 ºC (when the ambient temperature is 20 ºC).
3. the assembly plate of the oven chamber is divided into inner plate and outer plate, and the inner plate is selected δ= It is made of 0.5mm galvanized steel plate, and the outer side plate is selected δ= Made of 0.5mm color plate; Fill between inner and outer panels δ= 120mm rock wool insulation reduces heat transfer.
4. oven temperature control is to control the working state of the heater by outputting the command signal after comparing the electrical signal measured by the temperature sensor with the set temperature value (analog quantity) through the digital display temperature controller, so as to realize the automatic control / digital display of the furnace temperature.

5. interlock protection and automatic time delay control are adopted to ensure that the heater can only be turned on when the circulating fan works normally under any circumstances. After the heater stops working, the fan still works for a period of time to blow away the hot gas in the heating room for protection.
6. hot air circulation in drying furnace 3 times / minute

Automatic powder spraying room

The powder is mixed with air in the powder feeder and then sent to the powder gun. The high voltage generated by the high voltage electrostatic generator is connected to the interior or front end of the powder gun. The powder is charged in the interior or outlet of the powder gun. Under the joint action of pneumatic force and electrostatic force, the powder particles are directionally sprayed on the workpiece to be coated. It can also be adsorbed to the back of the workpiece. When the powder attached to the workpiece exceeds a certain thickness, electrostatic repulsion occurs, and the subsequent powder is not easy to be adsorbed to the workpiece surface, so that the workpiece surface reaches a uniform film thickness. Part of the powder is adsorbed in the cyclone collector under the action of the wind force, and the other part of the powder intermittently pulses the filter element under the action of the secondary filter element pulse controller and solenoid valve to vibrate the powder adsorbed on the surface of the filter element to the powder feeder at the bottom of the chamber for easy cleaning. The equipment is equipped with an automatic recovery system to ensure the normal circulation of powder, reduce powder consumption and save powder.

Frequency conversion reciprocating elevator

Frequency conversion reciprocating elevator: 2 elevators equipped with 8 automatic guns Main technical indicators: 1) Rated power supply: ac220v-240v/50-60hz 2) Rated power: 0.75kw 3) Reciprocating speed: 0.06-0.6m/s (stepless variable frequency speed regulation) 4) Effective stroke: 2.0m (special customized) 5) Upper and lower limit setting method: digital button adjustment 6) Reducer type: worm 7) Speed regulation mode: variable frequency speed regulation

Manual powder spraying host

1. reliable quality and stable operation with extremely low failure rate.
2. large and smooth powder output to improve your spraying efficiency.
3. the powder application ability at dead corners is very excellent, and it is not easy to leave dead corners.
4. anti "powder flushing" design makes the equipment stable when it is opened, without traditional powder flushing, and convenient for manual spraying.
5. constant powder output, any pressure change caused by any accumulation in the powder tube will not affect its constant output, and any interference caused by the length and short of the powder tube will not be affected.

Powder curing furnace

1. the main body of the drying rack is made of square tubes, and the chamber body is a plug-in plate combined bridge insulation structure, which is convenient for transportation and installation.
2. during installation, 100mm thick rock wool shall be pasted at the joint of furnace plate for insulation to ensure that there is no leakage at the wall joint. The average surface temperature of the outer wall of the drying channel shall not be higher than the ambient temperature by 15 ºC (when the ambient temperature is 20 ºC).
3. the assembly plate of the oven chamber is divided into inner plate and outer plate, and the inner plate is selected δ= It is made of 0.5mm galvanized steel plate, and the outer side plate is selected δ= Made of 0.5mm color plate; Fill between inner and outer panels δ= 120mm rock wool insulation reduces heat transfer.
4. oven temperature control is to control the working state of the heater by outputting the command signal after comparing the electrical signal measured by the temperature sensor with the set temperature value (analog quantity) through the digital display temperature controller, so as to realize the automatic control / digital display of the furnace temperature.
5. interlock protection and automatic time delay control are adopted to ensure that the heater can only be turned on when the circulating fan works normally under any circumstances. After the heater stops working, the fan still works for a period of time to blow away the hot gas in the heating room for protection.
6. hot air circulation in drying furnace 3 times / minute

 
Detailed Photos

 

 
High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing
Product Parameters
Serial number
Equipment name
water t/h(MAX)
Electric kw(MAX)
Natural gas m3/h(MAX)
1
Pretreatment equipment
5.0
70
 
2
Moisture oven
 
11
50
3
Powder spraying room
 
28
 
4
Curing oven
 
30
140
5
Conveyor
 
9
 
6
Other
 
/
 
 
Total
5.0
148
1200
type
Automatic powder spraying production line
Substrate
metal
Condition
New
Machine Type
JRX Automatic powder coating machine
Video outgoing-inspection
Provided
Machinery Test Report
Provided
Marketing Type
Hot sale
Warranty of core components
1 Year
Core Components
PLC
Coating
powder coating
Heat Energy
Electricity,natural Gas
Temperature
150-300ºC
Air cycle times
2-3 times
Temperature Difference
+-5ºC
keywords
Automatic powder spraying production line
Spraying Guns
auto spray gun

1. The whole line process, equipment layout, overall design and other key technical documents shall be confirmed and signed by Party A and Party B before taking effect.

2. In the design of equipment structure, Party B shall fully consider the convenience of Party A in use, maintenance and repair.

3. After the layout plan is confirmed, Party B can design the component structure and put it into manufacturing.

4. After receiving the equipment ground foundation schematic diagram, "five gas" power point location diagram, roof (side wall) reserved hole location diagram and energy
power parameters provided by Party B, Party A shall carefully review and confirm them before organizing the construction.

5. In the process of manufacturing, installation and commissioning, both parties must cooperate closely and cooperate with each other to jointly do a good job in technical quality supervision.

6. Party B must strictly comply with the drawings and technical agreement.

7. During the manufacturing of Party B's equipment, Party A may send personnel to Party B's processing site for inspection at any time.

8. Before the equipment is shipped, Party A shall send personnel to Party B to conduct periodic acceptance on the appearance, materials and manufacturing quality of the equipment.

9. When Party B enters the site for installation and commissioning, Party A shall send personnel to the site to supervise the construction as required, and Party B must actively cooperate with them.

10. Ensure the overall project quality after equipment installation and commissioning.

11. After the formal completion, the warranty period of the equipment is 12 months. In case of equipment quality problems during the warranty period, Party B shall be responsible for providing free services; After the warranty period expires, Party B shall be responsible for providing paid services and lifetime warranty.

Company Profile

High-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/BearingHigh-Speed Smart Control Overhead Conveyor Powder Coating Line Large Day Capacity Spray Booths for Aluminum Auto Motor/Bearing

Qingdao JRX M&T Co., Ltd

We are Qingdao JRX M&T Co., Ltd.

We have more than 10 years experience in developing powder spray machine products.
-- R & D team with rich experience in designing
-- Supply of customized services
-- CE certificate supply

We also have a professional engineer team, so don't worry about the machine installation and operation. Stable quality control and good production management have earned us the constant trust and cooperation of customers from Germany, the United Arab Emirates, Algeria and other countries.

After Sales Service

[1] The Contractor shall be responsible for providing the user with equipment instructions and training the operators.

[2] The warranty period of the product is one year. During the warranty period, if the product parts have quality problems, if the user is not responsible, the contractor is responsible for the repair.

[3] After the equipment is operated, the Contractor shall be responsible for tracking the service for two working days.

[4] Contact users by telephone regularly to solve equipment related issues.

[5] The Contractor shall provide technical guidance services for the equipment provided.

FAQ

1.Is there person reply to me?
Our person is 24-hours online. If no reply, please leave your message via e-mail and chat tools, we will reply you as soon as
possible.
2.Why we choose your company, what could you do for me?
We have established for more than 10 years, we have the stable production experiences.
We use the best steel to guarantee the products' quality.
We will always give you the heart to heart service.
We always speak with facts and quality.
3.Could your engineers teach and train our worker and stay in our factory for long time?
Yes, we have very large installation team, they can train and teach your worker to operate the paper machine, but you should pay them salary.
4.How can i know your machine work well?
Before delivery, we will test the machine work condition for you.

 

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier