Serial number
|
Equipment name
|
water t/h(MAX)
|
Electric kw(MAX)
|
Natural gas m3/h(MAX)
|
1
|
Pretreatment equipment
|
5.0
|
70
|
|
2
|
Moisture oven
|
|
11
|
50
|
3
|
Powder spraying room
|
|
28
|
|
4
|
Curing oven
|
|
30
|
140
|
5
|
Conveyor
|
|
9
|
|
6
|
Other
|
|
/
|
|
|
Total
|
5.0
|
148
|
1200
|
type
|
Automatic powder spraying production line
|
Substrate
|
metal
|
Condition
|
New
|
Machine Type
|
JRX Automatic powder coating machine
|
Video outgoing-inspection
|
Provided
|
Machinery Test Report
|
Provided
|
Marketing Type
|
Hot sale
|
Warranty of core components
|
1 Year
|
Core Components
|
PLC
|
Coating
|
powder coating
|
Heat Energy
|
Electricity,natural Gas
|
Temperature
|
150-300ºC
|
Air cycle times
|
2-3 times
|
Temperature Difference
|
+-5ºC
|
keywords
|
Automatic powder spraying production line
|
Spraying Guns
|
auto spray gun
|
1. The whole line process, equipment layout, overall design and other key technical documents shall be confirmed and signed by Party A and Party B before taking effect.
2. In the design of equipment structure, Party B shall fully consider the convenience of Party A in use, maintenance and repair.
3. After the layout plan is confirmed, Party B can design the component structure and put it into manufacturing.
4. After receiving the equipment ground foundation schematic diagram, "five gas" power point location diagram, roof (side wall) reserved hole location diagram and energy
power parameters provided by Party B, Party A shall carefully review and confirm them before organizing the construction.
5. In the process of manufacturing, installation and commissioning, both parties must cooperate closely and cooperate with each other to jointly do a good job in technical quality supervision.
6. Party B must strictly comply with the drawings and technical agreement.
7. During the manufacturing of Party B's equipment, Party A may send personnel to Party B's processing site for inspection at any time.
8. Before the equipment is shipped, Party A shall send personnel to Party B to conduct periodic acceptance on the appearance, materials and manufacturing quality of the equipment.
9. When Party B enters the site for installation and commissioning, Party A shall send personnel to the site to supervise the construction as required, and Party B must actively cooperate with them.
10. Ensure the overall project quality after equipment installation and commissioning.
11. After the formal completion, the warranty period of the equipment is 12 months. In case of equipment quality problems during the warranty period, Party B shall be responsible for providing free services; After the warranty period expires, Party B shall be responsible for providing paid services and lifetime warranty.
Qingdao JRX M&T Co., Ltd
We are Qingdao JRX M&T Co., Ltd.
We have more than 10 years experience in developing powder spray machine products.
-- R & D team with rich experience in designing
-- Supply of customized services
-- CE certificate supply
We also have a professional engineer team, so don't worry about the machine installation and operation. Stable quality control and good production management have earned us the constant trust and cooperation of customers from Germany, the United Arab Emirates, Algeria and other countries.
[1] The Contractor shall be responsible for providing the user with equipment instructions and training the operators.
[2] The warranty period of the product is one year. During the warranty period, if the product parts have quality problems, if the user is not responsible, the contractor is responsible for the repair.
[3] After the equipment is operated, the Contractor shall be responsible for tracking the service for two working days.
[4] Contact users by telephone regularly to solve equipment related issues.
[5] The Contractor shall provide technical guidance services for the equipment provided.
1.Is there person reply to me?
Our person is 24-hours online. If no reply, please leave your message via e-mail and chat tools, we will reply you as soon as
possible.
2.Why we choose your company, what could you do for me?
We have established for more than 10 years, we have the stable production experiences.
We use the best steel to guarantee the products' quality.
We will always give you the heart to heart service.
We always speak with facts and quality.
3.Could your engineers teach and train our worker and stay in our factory for long time?
Yes, we have very large installation team, they can train and teach your worker to operate the paper machine, but you should pay them salary.
4.How can i know your machine work well?
Before delivery, we will test the machine work condition for you.